Cisco Systems 7326 Manual De Usuario

Descargar
Página de 182
 
4-11
Cisco Wide Area Application Engine 7326 Hardware Installation Guide
OL-6831-02
Chapter 4      Installing Hardware Options
  Completing the Installation
For instructions on completing the installation, see the 
Completing the Installation
To complete your installation, follow these steps:
Step 1
Install the top cover.
Step 2
Install the device in a rack. 
For complete rack installation and removal instructions, see 
Caution
Install the device only in a rack cabinet with perforated doors.
Caution
Do not leave open spaces above or below an installed server in the rack cabinet. 
To help prevent damage to server components, always install a blank filler panel 
to cover the open space and to help ensure proper air circulation. See the 
documentation that comes with your rack cabinet for more information.
Step 3
Connect the cables and power cords. For information on connecting cables and 
power cords, see the