Schneider Electric PM5300 Manual De Usuario
PowerLogic™ PM5300 series
Chapter 15—MID Compliance
© 2014 Schneider Electric All Rights Reserved
109
Related topics
•
Installing the terminal covers
The voltage and current terminal covers help prevent tampering with the meter’s
voltage and current measurement inputs. The terminal covers enclose the terminals,
the conductor fixing screws and a suitable length of the external conductors and their
insulation. The terminal covers are secured by tamper-resistant meter seals.
voltage and current measurement inputs. The terminal covers enclose the terminals,
the conductor fixing screws and a suitable length of the external conductors and their
insulation. The terminal covers are secured by tamper-resistant meter seals.
The meter terminal covers must be installed by a qualified installer. The installation of
both the voltage and current terminal covers is required to provide tamper evidence for
MID installations.
both the voltage and current terminal covers is required to provide tamper evidence for
MID installations.
Location of terminal covers
1. Install the voltage terminal cover (A) and apply the seal at the sealing point (B).
2. Install the current terminal cover (C) and apply the seal at the sealing point (D).
PM5331/PM5341 default screen
The meter’s default home screen displays the following information.
A
Voltage terminal cover
B
Voltage terminal sealing point
C
Current terminal cover
D
Current terminal sealing point
A
D
C
B
Default PM5331/PM5341 display screen
A
Accumulated real energy (delivered + received)
B
Active tariff
C
System frequency
D
Power system setting
E
Locked / unlocked icon
A
E
C
B
D