Q-Logic 8C Manual De Usuario
4 – Installation
Powering Down a Switch
59042-01 A
4-17
6.
Close the FTP session.
ftp>quit
7.
Establish communications with the switch using the CLI. Enter one of the
following on the command line:
following on the command line:
telnet xxx.xxx.xxx.xxx
or
telnet switchname
where xxx.xxx.xxx.xxx is the switch IP address, and switchname is the
switch name associated with the IP address.
switch name associated with the IP address.
8.
A Telnet window opens prompting you for a login. Enter an account name
and password. The default account name and password are (admin,
password).
and password. The default account name and password are (admin,
password).
9.
Open an Admin session to acquire the necessary authority.
cli $>admin start
10.
Display the list of firmware image files on the switch to confirm that the file
was loaded. Refer to the
was loaded. Refer to the
for more
information.
cli (admin) $>image list
11.
Unpack the firmware image file to install the new firmware in flash memory.
cli (admin) $>image unpack filename
12.
Reset the switch to activate the new firmware. This will close the Telnet
session by default.
session by default.
cli (admin) $>reset
4.4
Powering Down a Switch
Simply unplugging the switch from the power source does not allow the switch to
complete executing tasks and could lead to flash memory corruption. For this
reason, open a Telnet session and use the Shutdown command to initiate an
orderly shut down, then power down the switch. Refer to the
complete executing tasks and could lead to flash memory corruption. For this
reason, open a Telnet session and use the Shutdown command to initiate an
orderly shut down, then power down the switch. Refer to the
.