Q-Logic 8C Manuel D’Utilisation

Page de 162
4 – Installation
Powering Down a Switch
59042-01 A
4-17
6.
Close the FTP session.
ftp>quit
7.
Establish communications with the switch using the CLI. Enter one of the 
following on the command line:
telnet xxx.xxx.xxx.xxx
or
telnet switchname
where xxx.xxx.xxx.xxx is the switch IP address, and switchname is the 
switch name associated with the IP address.
8.
A Telnet window opens prompting you for a login. Enter an account name 
and password. The default account name and password are (admin, 
password).
9.
Open an Admin session to acquire the necessary authority.
cli $>admin start
10.
Display the list of firmware image files on the switch to confirm that the file 
was loaded. Refer to the 
 for more 
information.
cli (admin) $>image list
11.
Unpack the firmware image file to install the new firmware in flash memory.
cli (admin) $>image unpack filename
12.
Reset the switch to activate the new firmware. This will close the Telnet 
session by default.
cli (admin) $>reset
4.4
Powering Down a Switch
Simply unplugging the switch from the power source does not allow the switch to 
complete executing tasks and could lead to flash memory corruption. For this 
reason, open a Telnet session and use the Shutdown command to initiate an 
orderly shut down, then power down the switch. Refer to the 
.