Cabletron Systems EMM-E6 Ethernet Manual De Usuario

Descargar
Página de 205
CONNECTING TO THE NETWORK
EMM-E6 User’s Guide
3-21
3.9.2
Connecting an AUI Cable to an EPIM-X
To connect an EPIM-X to a device not requiring SQE:
1.
Verify that the SQE LED on the EPIM-X is off. If the SQE LED is 
on, set the position of the SQE switch to off. 
2.
Attach one end of an AUI cable, no longer than 50 meters in length, to 
the port located on the EPIM-X (Figure 3-12) and the other end to the 
intended node.
Figure 3-12.  The EPIM-X
The Signal Quality Error (SQE) switch remains in the OFF 
position for most network connections. However, some Data 
Terminal Equipment (DTE) requires SQE. Refer to your DTE 
manual for SQE requirement information.
NOTE
If the SQE light remains on, even though the SQE switch is in 
the OFF position, contact Cabletron Technical Support.
NOTE
OFF Position
(Toward Front
of EPIM)
ON Position
(Toward Back
of EPIM)
OFF
ON
CH1Book  Page 21  Wednesday, March 20, 1996  7:48 AM