or  DPE  winding,  (c)  a  center  tapped  battery  charge 
winding  and  (d)  a  10  Amp  center  tapped  battery 
charge  winding.  Insulation  tests  of  the  stator  con-
sist  of  (a)  testing  all  windings  to  ground,  (b)  testing 
between  isolated  windings,  and  (c)  testing  between 
parallel windings. Figure 3-9 is a pictorial representa-
tion of the various stator leads on units with air-cooled 
engine.
TESTING ALL STATOR WINDINGS TO GROUND:
1. Disconnect stator output leads Wire 11 and Wire 44 from the
generator 50A circuit breaker.
2. Remove stator output lead Wire 22 from the neutral terminal
on the back of the 50A outlet.
3. Disconnect  the  C1  connector  from  the  bottom  of  the  control
panel. See Figure 3-10. The C1 connector is on the right when
facing the control panel.
11
44
22
77A
55
77
6
2
66
66A
55A
44S
11S
Figure 3-9. – Stator Winding Leads
4. Connect  the  terminal  ends  of Wires  11,  22,  and  44  together.
Make sure the wire ends are not touching any part of the gen-
erator frame or any terminal.
5. Connect  the  red  test  probe  of  the  Hi-Pot  tester  to  the  joined
terminal ends of stator leads 11, 22, and 44. Connect the black
tester lead to a clean frame ground on the stator can. With tes-
ter leads connected in this manner, proceed as follows:
a. Turn the Hi-Pot tester switch OFF.
b. Plug the tester cord into a 120 volt AC wall sock-
et  and  set  its  voltage  selector  switch  to  “1500 
volts”.
c. Turn  the  tester  switch  ON  and  observe  the 
breakdown  lamp  on  tester.  DO  NOT  APPLY 
VOLTAGE  LONGER  THAN  1  SECOND.  After 
one (1) second, turn the tester switch OFF.
If the breakdown lamp comes on during the one-sec-
ond test, the stator should be cleaned and dried. After 
cleaning and drying, repeat the insulation test. If, after 
cleaning  and  drying,  the  stator  fails  the  second  test, 
the stator assembly should be replaced.
6. Now  proceed  to  the  C1  connector  (  Female  side  –  Just
removed).  Each  winding  will  be  individually  tested  for  a  short
to ground. Insert a large paper clip (or similar item) into the C1
connector at the following pin locations:
pin 
location
Wire 
number
Winding
1
11S
Sense Lead Power
2
44S
Sense Lead Power
3
55A
Battery Charge
4
66A
Battery Charge
5
77A
Battery Charge
6
2
Excitation
7
6
Excitation
8
55
10 Amp Battery Charge
9
66
10 Amp Battery Charge
10
77
10 Amp Battery Charge
11
4
(Positive lead to Brush)
12
0
(Negative lead to Brush)
Next refer to Steps 5a through 5c of the Hi-Pot proce-
dure.
Example: Insert paper clip into Pin 1, Hi-Pot from 
Pin 1 (Wire 11S) to ground. Proceed to Pin 2, Pin 
3, etc. through Pin 10.
PIN 
LOCATION 
6
PIN 
LOCATION 
7
PIN 
LOCATION 
1
PIN 
LOCATION 
12
2
77A
66A
55A
44S
11S
0
4
77
66
55
6
Figure 3-10. – C1 Connector Pin Location Numbers 
(Female Side, Located to the Right When Facing the 
Control Panel)
TEST BETWEEN WINDINGS:
1. Insert  a    paper  clip  into  Pin  Location  3  (Wire  55A).  Connect
the red tester probe to the paper clip. Connect the black tes-
ter  probe  to Stator Lead  11. Refer  to Steps  5a through  5c of
“TESTING ALL STATOR WINDINGS TO GROUND”.
2. Repeat Step 1 at Pin Location 6 (Wire 2) and Stator Lead 11.