Emerson 2200S Manuel D’Utilisation

Page de 158
Configuration and Use Manual
25
Op
eratio
n
App
e
ndi
ces
Mai
n
tenan
c
e and
 T
roub
le
sh
oo
tin
g
Com
m
is
si
on
in
g
Chapter 3
Getting Ready to Configure
3.1
Overview
This chapter contains information and procedures that are required or useful for flowmeter 
configuration planning and configuration. The following topics are discussed:
Applying power to the flowmeter – see Section 3.2
Setting up and making an administrative connection – see Section 3.3
Process variables, display variables, and reporting options – see Section 3.6
3.2
Applying power
To apply power to the flowmeter:
1. Close and tighten all covers. 
WARNING!
 
Be sure that the Warning flap is closed and the 
transmitter housing cover is in place before applying power. Operating the flowmeter without 
covers in place creates electrical hazards that can cause death, injury, or property damage.
2. Apply power to the mA output wiring.
The flowmeter will automatically perform diagnostic routines. When the flowmeter has completed its 
power-up sequence, if the default settings are in effect:
The display will show the current mass flow rate and measurement unit.
If there are any active Fault or Informational alarms, the display will flash 
ALM_F
 or 
ALM_I
 
alternately with the mass flow measurement unit.
Note: See Section 5.3.1 for information on alarm severity (Fault, Informational, and Ignore). 
Note: The flowmeter is ready to receive process fluid approximately one minute after power-up. 
However, the transmitter may not be warmed up sufficiently, and may exhibit minor instability or 
inaccuracy. If you observe this, wait approximately ten minutes. If the condition does not disappear, 
follow standard troubleshooting procedures.