HTC Rev. A05 Manuel D’Utilisation

Page de 109
6/30/2008 2:31:32 PM
Doc. No. 
DOC-00040624  REV. 
Issued Date 
2008/4/14 
Revised Date 
2008/6/23 
A05 
Doc. Title 
Diamond Service Manual 
Page 
74  of  109 
 
HTC CONFIDENTIAL                                                                                                                                                          
SM-TP001-0704 
HTC Corporation 
5.2  Battery rundown test procedure 
Test Requirement: 
-Windows 2000/XP 
-USB Cable 
-ActiveSync 4.2 above (WINCE 6.0 should use ActiveSync 4.5) 
-Master Unit 
-Battery in Warranty 
 
Caution: Please charge your unit to full capacity for battery (until the green light 
is displayed) before doing the test.
 
TEST PROCEDURE 
Connect device to PC 
I. 
Setting and allow USB 
connections in Microsoft 
ActiveSync. 
II. 
Connect your device and desktop/ 
or laptop via USB cable. 
III. 
Check the pop-up message from 
Microsoft ActiveSync when 
device is synchronized with PC.
 
 
 
 
 
 
 
 
 
 
  
Copy the Battery Rundown tool into the device 
IV.  Make a folder in the device. 
V. 
Copy 
PowerDetect.exe
 into the 
folder.