Sterling A0552321 Manuel D’Utilisation

Page de 36
Pump Tanks 
Chapter 3: Installation 
15 of 36 
 
 
Chilled Water Piping Connections 
Process Pump Discharge (Single Well). Connect process pump discharge to the chiller 
evaporator water inlet. Size to the chilled water flow rate. Chiller evaporator inlet and outlet 
should have valves and temperature and pressure gauges. Outlet of the evaporator is 
connected to the chilled process water supply. 
Process Pump Discharge (Dual Well). Connect directly to the chilled water process supply. 
Size according to process flow requirements. 
Return (Single Well). Connect the chilled water returning from the process to the pump tank 
threaded return inlet. Size this line according to the chilled water flow rate. 
Makeup. Connect a 1” (approximately 25 mm) water line from a city water source to the 
makeup inlet to maintain the water level in the pump tank. 
Overflow. Connect the overflow outlet to an approved, trapped drain to permit excess water 
in the pump tank to overflow to the drain. Size the overflow line according to the size of the 
pump tank. (Consult specifications on page 23.) Do not connect to draw if glycol is used in 
the system. 
To Drain. Connect to a 2” (approximately 51 mm) line leading to an approved, trapped drain. 
Do not connect to draw if glycol is used in the system. 
Bypass (Single Well). Optional: recommended on single pump systems. Pipe full size to the 
pressure-regulating valve from the evaporator outlet to allow flow if process does not require 
flow, to ensure proper flow through the evaporator at all times. 
3-8 Initial 
Start-up 
•  Remove all tools, foreign matter and debris from the pump tank reservoir and piping. 
•  Complete all piping leading to and from the pump tank. Observe all applicable codes. 
•  Complete all electrical wiring. Observe all applicable codes. 
•  Prepare all related equipment in the system for operation. 
•  Leak check piping. Flush and clean system.