Replacing fixture head
(drywall)
1/4-20 x1 1/2"
Pan head screw
Warning
:  Before starting any work ensure 
that all sources of power are turned off.  All 
work must meet local/national codes and be 
performed by a certified electrician.  Do not 
mount fixtures vertically. 
Installation Instructions
Vault w/ visor
C-Scroll w/ visor
Roundel w/ visor
These installation instructions are valid with the above Ametrix styles.
2.
3.
Sheet 2 of 5
Large, INDOOR
SRR 
(Semi-Recessed, Remote ballast)
Visor and Non-Visor
ADY071461   REV A(ECN070344)
2.
3.
Conduit from 
power source.
(by others)
Electrical 
cover plate
Fixture
housing
1.  Using cut out dimensions provided on page four(4), cut 
     hole into dry wall and feed power wire to hole.
2.  After removing fixture head, loosen #10-32 x3/8" Pan head 
     screws and remove electrical cover plate.
3.  Knock out appropriate hole for conduit and attach as shown 
     on page three(3).
4.  Replace cover plate and secure with #10-32 x3/8" Pan head 
     screws and press fixture housing into hole in drywall.
1.  Prior to pushing fixture into hole in drywall, tie off fixture 
     housing to structure using safety wire(by others) as show on 
     page three(3).
2.  Gently push fixture housing into hole and tighten 1/4-20 x 1 
     1/2" Pan head screw from inside fixture housing to tighten 
     drywall bracket around drywall.
3.  Connect appropriate wires from fixture head and ensure all 
     wires are properly matched.
4.  Replace fixture head assembly on keyhole screws and 
     tighten.
Replacing brackets on fixture housing
1.  Loosely reattach brackets to both sides of fixture housing.
2.  Press brackets flush to ceiling tile and secure using #10-32 
     Hex nuts.
#8-32
hex nut
(x4)
Ceiling grid 
bracket
#8-32
Hex nut
(4x)
Ceiling grid 
bracket
Fixture 
assembly
1.  If possible, remove ceiling tile from grid to facilitate fixture 
     installation.
2.  Using cut out dimensions provided on page four(4), cut 
     appropriate size opening in ceiling tile.
3.  Carefully insert fixture assembly into cut out in ceiling tile.
Securing fixture to ceiling tile
Semi-recessed fixtures shown without thermal protectors
Wiring the fixture
(drywall)