Nilfisk-Advance America 01610A Manuel D’Utilisation

Page de 48
FORM NO. 71456A - UHB 51-1500 - 7
PREPARING THE MACHINE 
FOR USE
(B)-INSTALLING THE BATTERIES
1 
Carefully lift the batteries into the battery  tray.  Arrange as shown in 
 Figure 
B.
B
2 
Make sure the key switch is in the OFF position.
3 
Install the battery cables as shown in fi gure B, with the terminals marked 
“P” on the positive battery posts and the terminals marked “N” on the 
negative battery posts.  Position the cables so that the caps can be 
easily removed when it is necessary to add water to the batteries.
4 
Tighten the nut on each battery terminal just enough to keep the terminal 
from being turned on the battery post.  Then tighten the nut one more 
full turn.
5 
Coat all the terminals and posts with grease, petroleum jelly or spray-on 
battery coating (available at most auto parts stores).
6 
Put on the black rubber “boots” over each of the terminals and use the 
plastic tie straps to hold them in place.
7 
Join the connector from the battery pack to the connector on the control 
panel.
8 Reassemble 
machine.
NOTE: Charge the batteries before using the machine.
(C)-PAD INSTALLATION
Your local Nilfi sk distributor can provide the proper pads and fl oor fi nishes for 
use with this machine.
CAUTION!
Using the wrong kind of pad on this machine can damage 
the fl oor.  The pad must be centered properly on the pad 
holder to prevent machine vibration.
For pad installation, follow the steps below (see steps 1 - 6 in Figure 
C):
Turn the key switch off.
2 
Put the machine in the position shown, to access the pad retainer.
Go to the front of the machine.  While holding the pad retainer with one hand, 
rotate the pad and pad driver counter clockwise to loosen the pad retainer.
Remove the old pad and install a new one, being careful to center it on 
the pad driver.
Retighten the pad retainer as tight as possible.
Raise the back of the machine to lower the pad housing by lifting as 
shown.
(D)-DUST BAG INSTALLATION
Your local Nilfi sk distributor can provide the proper pads and fl oor fi nishes for 
use with this machine.
IMPORTANT!
Install dust collector bag (part number 56201569) on top of  
control housing (see Figure D). The dust collection system will 
not operate properly if the collector bag is full or torn.
(E)-ADJUSTING PAD PRESSURE
The pad pressure is set at the factory for optimal burnishing with most 
pad and fi nish combinations.  If unique pad or fi nish conditions require 
pad pressure adjustments, adjust by following the procedure below.  
NOTE:  Pad pressure adjustments should be performed by a qualifi ed 
service technician.
1 
Turn key switch off (O).
2 
From underneath burnisher, loosen jam nut (A).
To  decrease pad pressure , turn bolt (B) clockwise.
To increase pad pressure, turn bolt  (B) counterclockwise.
Re-tighten jam nut (A).
 
EN
ENGLISH