Emerson Series 3000 MVD Manuel D’Utilisation

Page de 348
Configuration and Use Manual
195
Measurement Performance
Dia
g
nostics and T
roub
leshooting
Spe
c
ifica
tions – Model 
3
350
/3
7
0
0
Specific
a
tions
 –
 Model 
330
0
/3
500
Measure
ment P
e
rf
or
mance
21.3.5
Setting up automatic or remote execution of the meter verification test
Note: Requires Smart Meter Verification. Scheduling is not available with the original version of the 
meter verification application.
There are three ways to execute a Smart Meter Verification test automatically:
Define it as an event action
Set up a one-time automatic execution
Set up a recurring execution
In addition, if your transmitter has a discrete input, you can configure the discrete input to initiate a 
Smart Meter Verification test remotely.
In all cases, the test will be performed with outputs set to 
Continue Measuring
.
You can use these methods in any combination. For example, you can specify that a Smart Meter 
Verification test will be executed three hours from now, every 24 hours starting now, every time a 
specific discrete event occurs, and every time the discrete input is activated.
To define meter verification as an event action, see Figure 10.4.
To define meter verification as a discrete input action, see Section 7.3.5.
To set up a one-time automatic execution, set up a recurring execution, view the number of 
hours until the next scheduled test, or delete a schedule:
-
With ProLink II, click 
Tools > Meter Verification > Schedule Meter Verification
.
-
With the display, see Figure 21-9.
-
With the Communicator, see Figure 21-10
Note the following: 
If you are setting up a one-time automatic execution, specify the start time as a number of 
hours from the present time. For example, if the present time is 2:00 and you specify 3.5 hours, 
the test will be initiated at 5:30.
If you are setting up a recurring execution, specify the number of hours to elapse between 
executions. The first test will be initiated when the specified number of hours has elapsed, and 
testing will be repeated at the same interval until the schedule is deleted. For example, if the 
present time is 2:00 and you specify 2 hours, the first test will be initiated at 4:00, the next at 
6:00, and so on.
To turn off automatic execution from the display, set the appropriate value (
Next Run
 or 
Recurring Time
) to 0 hours.