Main burner and Orifice
Removal
1.  Remove screws and burner hold-down bracket.
NOTE: If the heat exchanger is sooted badly, the
burner hold-down bracket and spacer can become
distorted  from  direct  flame  impingement  and  this
usually necessitates replacement of these parts.
2.  Lift burners from slotted spacer and slide from ori-
fices. Clean with a wire brush.
3.  Orifices  usually  do  not  need  to  be  replaced.  To
clean, run either copper wire or wood through ori-
fice. Do not enlarge hole. To remove orifice, use a
socket wrench and remove the manifold. DO NOT
overtighten when reinstalling.
Pilot Removal and Cleaning
1.  Disconnect pilot tubing at pilot and sensor/igniter
wire. Remove screws holding pilot bracket to burn-
er tray.
2.  Remove  pilot  and  bracket,  clean  pilot  of  debris,
small bugs, etc., with wire or small brush.
3.  Replace  pilot,  pilot  tubing,  sensor  ignition  wires
and check for leaks.
High Limit or Tankstat
Removal
1.  Turn off electrical power.
2.  Remove front inspection panel.
3.  Remove  wires  to  high  limit  and  loosen  screws
holding high limit to cabinet.
4.  Remove wedge clip holding sensing bulb in con-
trol well.
5.  Remove high limit and install a new one.
6.  Check control operation before leaving job.
Heat Exchanger Removal
1.  Shut  water,  gas  and  electricity  off,  close  valves
and relieve pressure, remove relief valve.
2.  Remove side inspection panels.
3.  Remove top holding screws.
4.  Remove draft diverter, lift and remove top and flue
collector  on  stack  type  models.  Remove  inspec-
tion panels.
5.  Loosen bolts and disconnect flange nuts on in/out
header,  loosen  union(s)  at  gas  pipe,  and  slide
heater  away  from  piping  until  studs  clear  the
heater.
6.  Remove heat exchanger corner brackets.
7.  Remove combustion chamber clips at the four cor-
ners of the heat exchanger.
Fig. 40: Typical Heat Exchanger Configuration
8.  Lift heat exchanger straight up using caution not to
damage refractory.
Heat Exchanger Re-Assembly
1.  Heat  exchanger  water  header  O-rings  must  be
replaced with new ones.
2.  Install in/out and return water headers and install
header retainer nuts and torque nuts evenly.
3.  Install  the  four  (4)  corner  clips  between  tube
sheets and refractory. Replace "V" baffles.
4.  Install  thermostat  sensing  bulbs  in  header  wells
and replace bulb retaining clips.
5.  Install  inlet  and  return  pipes  in  water  headers
using pipe thread sealant.
6.  Install water pressure relief valve, flow switch, and
low water cut-off devices (if so equipped).
7.  Open water supply and return shut-off valves. Fill
heater and water piping system with water. Check
heater and piping system for leaks at full line pres-
sure. Run system circulating pump for a minimum
of 1/2 hour with heater shut-off.
8.  Shut  down  entire  system  and  vent  all  radiation
units and high points in system piping. Check all
strainers  for  debris.  Expansion  tank  water  level
should be at the 1/4 mark and the balance of the
tank filled with air.
9.  Install flue collector, jacket top and inspection pan-
els. Install top holding screws. Install draft diverter
and vent piping if so equipped.
10.  If gas piping was disconnected, reconnect gas pip-
ing  system  and  check  for  leakage  using  a  soap
solution.
11.  Check for correct water pressure and water level
in the system. Make sure that system pump oper-
ates immediately on the call for heat. The system
is ready for operation.
12.  Within  two  (2)  days  of  start-up,  recheck  all  air