Mitsubishi Electronics MR-J3 Manuel D’Utilisation

Page de 668
 
 
14 -  48 
14. OPTIONS AND AUXILIARY EQUIPMENT 
 
(3) Connection diagram 
(a) 200V class 
S2/L
22
T2/L
32
DOCOM
RA1
EMG
C
B
R/L
11
S/L
21
T/L
31
R2/L
1
R2/L
12
S2/L
2
N/L
P24
SD
RDYB
RDYA
RSO
SE
A
P/L
T2/L
3
R/L
11
S/L
21
T/MC1
RES
SD
L
11
L
21
P
N
U
V
W
EMG
RA1
RA2
U
V
W
0HS2
0HS1
CN2
MC
NFB
FR-CVL
FR-CV
MC
RA1 RA2
EMG OFF ON
RESET
SK
MC
P
1
DICOM
Servo motor
Servo amplifier
Thermal 
relay
(Note 2)
(Note 7)
(Note 6)
Servo system 
controller
24VDC 
power 
supply
(Note 1)
(Note 1)
(Note 5)
(Note 3)
(Note 4)
(Note 1)
(Note 1)
3-phase
200 to
230VAC 
 
Note 1. Configure a sequence that will shut off main circuit power at an emergency stop or at FR-CV or servo amplifier alarm 
occurrence. 
2. For the servo motor with thermal relay, configure a sequence that will shut off main circuit power when the thermal relay 
operates. 
3. For the servo amplifier, configure a sequence that will switch the servo on after the FR-CV is ready. 
4. For the FR-CV, the RSO signal turns off when it is put in a ready-to-operate status where the reset signal is input. 
Configure a sequence that will make the servo inoperative when the RSO signal is on. 
5. Configure a sequence that will make a stop with the emergency stop input of the programmable controller if an alarm occurs 
in the FR-CV. When the programmable controller does not have an emergency stop input, use the forced stop input of the 
servo amplifier to make a stop as shown in the diagram. 
6. When using the servo amplifier of 7kW or less, make sure to disconnect the wiring of built-in regeneration resistor (3.5kW or 
less: P-D, 5k/7kW: P-C). 
7. When using the servo amplifier of 11k to 22kW, make sure to connect P
1
 and P. (Factory-wired.)