Scag Power Equipment STT-31BSD Manuel D’Utilisation
Section 6
27
To adjust the Custom-Cut Baffle height:
1. Place the cutter deck in the transport position.
2. Remove the hardware securing the Custom-Cut
Baffle to the cutter deck. (See Figure 6-8).
-NOTE-
Hardware location used in the illustrations are
for reference only. Location of hardware may
vary depending on cutter deck size.
for reference only. Location of hardware may
vary depending on cutter deck size.
Figure 6-8. Custom-Cut Baffle
3. Move the Custom-Cut Baffle to desired position.
(See Figures 6-9 through 6-11 for position).
4. Reinstall the mounting hardware as shown. (See
Figures 6-10 though 6-11). Torque hardware to
39ft.lbs.
39ft.lbs.
Figure 6-9. 3" Custom-Cut Baffle Position
Figure 6-11. 4" Custom-Cut Baffle Position
Figure 6-10. 3-1/2" Custom-Cut Baffle Position
2004 CCB
MOUNTING
HARDWARE
HARDWARE
MOUNTING
HARDWARE
HARDWARE
2004 CCB - 3" Setting
CARRIAGE BOLT
TOP SET OF HOLES
FOR 3" SETTING
FOR 3" SETTING
FLATWASHER
ELASTIC STOP
NUT
NUT
2004 CCB - 3-1/2" Setting
CARRIAGE BOLT
MIDDLE SET OF HOLES
FOR 3-1/2" SETTING
FOR 3-1/2" SETTING
FLATWASHER
ELASTIC STOP
NUT
NUT
2004 CCB - 4" Setting
CARRIAGE BOLT
BOTTOM SET OF HOLES
FOR 4" SETTING
FOR 4" SETTING
FLATWASHER
ELASTIC STOP
NUT
NUT