Adaptec MAN-FC2002-001 Manuel D’Utilisation

Page de 110
107
Installing the Battery 
Backup Unit
The battery backup unit (BBU) for the RAID controller is 
installed on the ACM unit (see Figure D-1).
Figure D-1   Location of Battery Backup Unit on ACM
Follow this procedure to install the Battery Backup Unit 
(BBU):
1
Remove the ACM from the enclosure by loosening the two 
ACM screws and using the handle, slide the ACM out of the 
enclosure.
2
Lay the ACM on a flat surface as in Figure D-1 above.
3
Orient the BBU as shown (see Figure D-2).
ACM Assembly
BBU goes here