Fujitsu C122-E177-01EN Manuel D’Utilisation

Page de 512
MMB Web-UI (Web User Interface) Operations 
 
 
 
FIGURE 1.41 [Schedule Control] Window 
 
 
If the maintenance work (Either Hot Partition Maintenance, Warm System Maintenance or Cold System 
Maintenance) of the targeted partition is executed in the schedule execution time, the scheduled operation 
does not execute the power operation of the partition. 
 
If the schedule overlaps on the same day, it is processed according to the following priority levels. 
 
Special > Monthly > Weekly > Daily 
 
 
Daily: Schedule executed every day 
 
Weekly: Schedule executed every week 
 
Monthly: Schedule executed every month 
 
Special: Schedule executed on specific day every year 
 
Moreover, if the Power On and Power Off is specified at the same time, the priority is given to Power Off.  
 
In case of Partition Operator, only the management target partition can be operated. 
 
Because Partition does not do Power On in Power On Delay, Schedule Power Off is disregarded. Moreover, 
when OS does not accept the Shutdown demand, Power Off is not done. 
 
TABLE 1.58 Display Items and Setting Items of [Schedule Control] Window 
Items 
Description 
Displays the number that identifies the partition (0~3). 
However, only the partition to which SB/IOU is registered is displayed. 
Partition Name 
Displays the partition name. 
Schedule Control 
Sets whether schedule operation is done for every partition.  
 
On