Fujitsu C122-E177-01EN Manuel D’Utilisation

Page de 512
MMB Web-UI (Web User Interface) Operations 
 
 
 
TABLE 1.59 [Schedule Control] Window Buttons 
Buttons 
Description 
Apply 
When the [Apply] button is clicked, the schedule operation information for the specified partition 
is set. 
Cancel 
When the [Cancel] button is clicked, the browser returns to the original status without setting the 
schedule operation information for the partition. 
 
(1)  Menu Operation 
 [Partition] ‐ [Schedule] ‐ [Schedule Control] 
(2)  Window Operations 
1. 
Specifies whether schedule operation has to be carried out by Radio button for every partition. 
2. 
Click the [Apply] button. 
  [Schedule list] Window 
Up to 1000 instances of partition power On / Off schedule can be recorded in the [Schedule list] Window. 
 
FIGURE 1.42 [Schedule List] Window 
 
 
Schedule will appear in the order of the partition number.  
Partition, will appear in chronological order of the start date of the period. 
If the partition and the start date are the same, the schedule appears in the sequence in which it is listed. 
 
Remarks 
If the Type is Weekly, the start date is considered to be “Oneday”. 
Only the partition to be managed can be operated for Partition Operator.