Always install the heavier equipment in the lower half of the rack to maintain a low center of gravity to prevent the rack 
from falling over.
  •
Install and use the cable-management brackets included with the Cisco RFGW-10 UEQAM to keep the cables organized 
and out of the way of the cards and processors. Ensure that the cables from the other equipment already installed in the 
rack do not impair access to the cards or require you to disconnect cables unnecessarily to perform equipment maintenance 
or upgrades.
  •
Install rack stabilizers (if available) before you mount the chassis.
  •
Provide an adequate chassis ground (earth) connection for your Cisco RFGW-10 UEQAM chassis.
Table 1 shows the weight and dimensions of the Cisco RFGW-10 UEQAM.
Table 1
Physical Characteristics of Cisco RFGW-10 UEQAM
Rack-mounting a Cisco RFGW-10 UEQAM
The Cisco RFGW-10 UEQAM can be installed in either front mount or mid mount configuration. The chassis rack-mounting 
flanges must be secured directly to the chassis before lifting it into the rack. For installing the Cisco RFGW-10 UEQAM 
rack-mount brackets, go to: 
  •
  •
Verifying Rack Dimensions
Before you install the chassis, measure the space between the vertical mounting flanges (rails) on your equipment rack to verify 
that the rack conforms to the measurements shown in Figure 2. 
Step 1
Mark and measure the distance between the two holes on the left and right mounting rails. The distance should measure 
18.31 inches ± 0.06 inches (46.5 cm ± 0.15 cm).
Note
Measure the pairs of holes near the bottom, middle and top of the equipment rack to ensure that the rack posts are 
parallel.
Step 2
Measure the space between the inner edges of the left front and right front mounting flanges on the equipment rack.
The space must be at least 17.7 inches (45 cm) to accommodate the chassis, which is 17.25 inches (43.8 cm) wide and 
fits between the mounting posts on the rack.
Characteristic
Description
Height
13RU (22.75 in / 577.85mm)
Width
17.48 in. (444mm) with rack-mounts
Depth
Overall depth including card handles, UCH2 cable holders, 
power supply handles: 24.93 inches (633.2mm) 
Depth from the front rack-mount bracket including card 
handles, UCH2 cable holders, power supply handles: 24.13 
inches (612.9mm) 
Depth from the front rack-mount bracket including rear RF 
cable management bracket 26 inches (660mm) 
Weight of fully configured chassis
275 lbs (125 kg - with RFGW-DS48 line card and two DC 
PEMs)