Cisco Systems Gateway 10 Manuel D’Utilisation
8
Figure 3
Chassis Installation Bracket
Note
After the chassis is installed and secured to the rack, the chassis installation brackets can be removed from the rack.
The brackets are not needed for supporting the chassis when all the rack-mount screws are installed.
The brackets are not needed for supporting the chassis when all the rack-mount screws are installed.
Installing the Chassis Installation Handles
This section explains how to attach the chassis installation handles to the chassis.
Before installing the chassis in the rack, it is recommended that you install a chassis lifting handle to each side of the chassis to
aid in lifting the chassis onto the rack.
aid in lifting the chassis onto the rack.
Note
It is recommended to install the two side chassis installation handles while unpacking to aid in moving the chassis off
the palette.
the palette.
Note
Chassis installation handles should not be installed if the chassis is to be mid mounted.
To install the chassis installation handles on a Cisco RFGW-10 UEQAM, complete the following steps:
Step 1
Locate the two M5 threaded holes on the upper center of each side of the chassis that align with the handle captive
screws.
screws.
Step 2
Install the two chassis installation handles on either side of the chassis and tighten the captive screws.
Chassis
installation
bracket
installation
bracket
273445