Force10 Networks E1200i Manuel D’Utilisation

Page de 105
Installing and Maintaining the E1200i System
11
This guide provides site preparation recommendations, step-by-step procedures to rack mount the Force10 
Networks E1200i chassis, as well as instructions to install fan trays, power supplies, route processor 
modules (RPMs), switch fabric modules (SFMs), and line cards. 
This guide also includes instructions for removing and installing field-replaceable parts, including power 
supplies for both the AC and DC models. The E1200i system is packaged with components necessary for 
optimal performance, including blank panels for RPM, SFM, and line card slots. Blanks are required in 
empty slots to ensure adequate system cooling and for EMI containment during operation. 
After you complete the hardware installation process and power up the system, refer to the 
FTOS
 
Configuration Guide for preliminary software configuration information. E1200i systems run Force10 OS 
(FTOS™) software. The FTOS Command Reference for the E-Series provides detailed CLI information, 
and the FTOS Configuration Guide for the E-Series includes FTOS configuration information.
Information Symbols and Warnings
 defines the information symbols used throughout this guide. 
Chapter 1
About This Guide
Table 1   Information Symbols
Symbol
Warning
Description
Danger: 
This symbol warns that improper handling and installation could result in bodily 
injury. Before you begin work on this equipment, be aware of hazards involving 
electrical circuitry, networking environments, and instigate accident prevention 
procedures.
Caution: 
This symbol informs you that improper handling and installation could result in 
equipment damage or loss of data. 
Warning: 
This symbol informs you that improper handling may reduce your component 
or system performance.
Note: 
This symbol informs you of important operational information.