RAD Data comm MBE10-8D Manuel D’Utilisation

Page de 58
 
 Site 
Requirements 
and Prerequisites 
2-1 
Chapter 2 
Installation 
This chapter describes the basic installation procedures for the MBE unit, 
including: 
•  Site requirements and prerequisites  
•  Package contents  
•  Equipment needed  
•  Installation and setup. 
2.1 Introduction  
MBE is delivered completely assembled. For instructions on installation of a single 
unit or two units in a 19-inch rack refer to the Rack Mounting Kit for 19-inch Racks 
guide that comes with the RM kit. 
After installing the unit, see 
Chapter 3, Operation
 for operating instructions. 
In case a problem is encountered, refer to
 Chapter 4
 for fault isolation and 
troubleshooting instructions. 
 
Any adjustments, maintenance or repairs should be performed only by a skilled 
technician who is aware of the hazards involved. 
Always observe standard safety precautions during installation, operation, and 
maintenance of this product. 
 
2.2  Site Requirements and Prerequisites 
Inspect the equipment container before unpacking. Note and report evidence of 
damage immediately to your RAD distributor.
 
 
Install the MBE unit within 1.5m (5 ft) of a grounded AC outlet furnishing  
240V (115V).  
Allow at least 90 cm (36") of frontal clearance for operator access. Allow at least  
10 cm (4") clearance at the rear of the unit for interface cable connections.  
The ambient temperature should be regulated between 0° to 50°C  
(32°F to 122°F) at a relative humidity of up to 90%, non-condensing.  
Note 
Order from: Cutter Networks
Ph:727-398-5252/Fax:727-397-9610
www.bestdatasource.com