Emerson GXT 10KVA Manuel D’Utilisation

Page de 32
Cable Installation
18
Figure 11 Connecting Nfinity to Maintenance Bypass with transformer
NOTE
1. SINGLE-SOURCE FEED—If feeding the Maintenance Bypass Cabinet from a single 
source, the input connection may be made to either TB1 or TB2.
2. DUAL-SOURCE FEED—If feeding the Maintenance Bypass Cabinet from a dual source, 
the UPS input supply connection must be made to TB1 and the bypass input supply 
connection must be made to TB2. The jumpers between TB1 and TB2 must be removed.
3. If connected equipment is a combination of 208 VAC and 120 VAC, use a three-phase panel 
board connected to the output terminal TB6.
G
TB1
TB2
G
TB3
TB4
1 2 3
TB5
TB6
L1
L2
L1
L2
L1 L2
G
1 2 3 4
1
2
3
4
120
208
240
120
L1 L2
G
1 2 3
1 2 3 4 5
GEC
TB3
TB2
TB1
Flexible 
conduit
208
240
N
FINITY
 UPS
N
FINITY
 M
AINTENANCE
 B
YPASS
 C
ABINET
 
W
ITH
T
RANSFORMER
See Nfinity 
user manual 
for details on 
connecting 
GEC.
G
G
G
Remove these two 
wires for dual source
(see NOTE bel
ow)
Ensure that both tap 
selectors are set to the 
correct input voltage
GEC
Input 2
Input 1