Emerson GXT2-PP20KRT208 Manuel D’Utilisation

Page de 36
Installation
16
5.4
Add an Output Power Distribution Module—Optional 
To add an optional output distribution module to the Liebert GXT2-PP20KRT208:
1. Disconnect and secure utility power from the parallel POD and completely power Off all 
connected UPSs.
2. Remove the four screws securing the blank output distribution cover plate of the parallel POD.
3. Set the screws aside to attach an output distribution module to the parallel POD.
4. Snap together the color-coded, mating electrical connectors of the optional output distribution 
module to the parallel POD. 
5. Use the screws removed in Step 2 to attach the output distribution module to the distribution 
module to the parallel POD.
!
WARNING
Risk of electric shock. Can cause equipment damage, injury or death.
Lethal voltages may exist within the UPS and parallel POD as long as the UPS is connected.
Before beginning to install the optional output distribution module, make sure the paralleling 
system and all connected UPSs are completely powered off.
NOTE
The Liebert GXT2-PP20KRT208 distribution POD options are different than the distribution 
PODs used with individual Liebert GXT2-10000RT208 UPSs. Each POD type has different 
connectors and are not interchangeable.
If a Liebert GXT2-10000RT208 UPS that is to be connected to the parallel POD has a 
distribution POD option, then the distribution POD must be removed from the UPS to connect 
the parallel power cable assembly to the UPS.
PD-202
Electrical connector 
snaps to connector 
inside parallel POD
Screw holes to attach 
to parallel POD
Screw holes to attach 
to parallel POD
Optional output power 
distribution module
(PD-202 shown)
Install the optional output 
power distribution module 
in the parallel POD