Emerson 40-200KVA Mode D'Emploi

Page de 132
Installation Drawings
52
Figure 26 Terminal details, 34" battery power pack system for Liebert
®
 NX
 480V UPS
Table 23
Battery cabinet ground
Unit Rating
Bolt Size
Torque
lb-in (N-m)
80
1/4" (M6)
44 (5)
Source: U3819205, Rev. 2
Table 24
Battery cabinet circuit breaker
Cabinet
Rating
Battery
Current
OCP Device
Rating
Bolt Size
Torque
lb-in (N-m)
80kVA
195
225
1/4" (M6)
 44 (5)
Source: U3819205, Rev. 2
1. All dimensions are in inches [mm].
2.All cables should be routed before bolting cabinets
   together.
3. For stand-alone installations, the interconnecting
    cables between the battery cabinet and the UPS
    must be provided by others. Optional battery
    intercabinet wiring kits are available for
    side-by-side line-up installations.
4. All hardware supplied with battery cabinet for
    bolting cabinet to UPS. Use M6 hardware provided;
    assemble as shown in detail drawings.
5. See installation, operation and maintenance
    manual for additional information.
6. All external wiring is to be in accordance with
   national and local electrical codes.
U3819205
Rev. 2
Fuse input Alber
monitoring system
(optional)
(+) Positive
Transformer for Alber
monitoring system
(optional)
PCB
FRONT VIEW
Without Doors and Protecting Plate
TOP VIEW
Without Protecting Plates
DETAIL B
DETAIL C
DETAIL A
GND
Busbar
See
Detail B
See
Detail A
See
Detail C
Terminal Block
Aux. Contacts
1.2 (30)
1.2 (30)
30 (76)
2.3 (59)
Ø 0.4
(9)
(-) Negative