Emerson 480V Manuel D’Utilisation

Page de 112
Options
90
10.2 LBS Mode—Load Bus Synchronization
The function of LBS is to keep the output of two independent UPS systems (single unit or multiple 
unit) in synchronization even when the two systems are operating in different modes (bypass/
inverter) or on batteries. It is usually used with a Static Transfer Switch connected to the critical load 
to achieve dual bus configuration.
10.2.1 Remote Alarm Monitor
Status and alarm conditions are available on an optional remote alarm monitor (RAM) panel, which is 
driven by volt-free alarm status contacts (from an optional relay alarm board).
10.3 Replacing Dust Filters
1. Open the UPS door.
2. The dust filters are behind the door. For each filter, there is a bracket on either side holding the 
dust filter in place, as shown in Figure 64.
3. Remove one bracket and loosen the other. The second bracket need not be removed.
4. Remove the old filter and replace with the new filter
5. Reinstall the bracket that was removed and tighten the other bracket.
Figure 64 Dust filter replacement
NOTE
In LBS configuration, both units must be supplied from the same utility source.
 
Bracket
Sems screw
Bracket