APC 10-40 KVA 380/400/415 V Manuel D’Utilisation

Page de 32
Smart-UPS VT ® 10-40 kVA 380/400/415 V, 208/220 V, 200/208 V Battery Installation
22
Reinstall the Enclosure Plates
Reinstall the cable landing cover plates and the bottom plates
1. Reinstall the cable landing cover plates on the XR Battery Enclosure(s)
2. Install the upper part of the conduit box (if applicable) on all enclosures.
3. Reinstall the bottom plates on the UPS and the XR Battery Enclosure(s).
Reinstall the top cover, battery compartment cover, and the front panel
1. Reinstall the top cover by fastening the 
four screws at the front and the two 
screws at the back.
2. Reinstall the battery compartment cover 
(only applicable to Japanese 
configurations) by placing the taps in the 
slots at the bottom of the enclosure and at 
the top of the enclosure.
3. Attach the battery compartment cover 
with M6 screws to the inner side panels 
in both sides.
5. Reinstall the front panel by inserting 
the two taps at the bottom of the front 
panel into the two slots at the bottom 
of the enclosure.
6. Push the front panel forward until it 
engages the locking devices at the 
top of the enclosure.
7. Use a screwdriver to set the lock 
mechanism to the locked position