Q-Logic 5600 Manuel D’Utilisation

Page de 336
4 – Managing Switches
Setting the Date/Time and Enabling NTP Client
4-16
59097-02 B
S
4.5
Setting the Date/Time and Enabling NTP Client
The Date/Time and Network Time Protocol (NTP) dialog enables you to manually 
set the date and time on a switch, or to enable the NTP Client to synchronize the 
date and time on the switch with an NTP server. Enabling the NTP client ensures 
the consistency of date and time stamps in alarms and log entries. An Ethernet 
connection to an NTP server is required. When date/time is set or displayed in the 
firmware, it is always in Universal Time, However, when displayed in the 
Date/Time dialog, the value is always in local time. The difference between switch 
and workstation times must not exceed 24 hours, or the switch management 
application can not connect. To set the date and time on a switch, do the following:
1.
Select a switch in the topology display, and open the faceplate display.
2.
Open the Switch menu, and select Set Date/Time....
3.
Choose one of the following:
„
Enter the year,month, day, time, and time zone in the Switch 
Date/Time dialog, then click OK. The new date and time take effect 
immediately. 
„
Click the NTP Client Enabled checkbox to enable the switch to 
synchronize its time with an NTP server. Enter the IP address of the 
NTP server. Ethernet connection to NTP server is required. Click the 
OK button to save the settings. 
4.6
Resetting a Switch
Resetting a switch reboots the switch using configuration parameters in memory. 
Depending on the reset type, a switch reset may or may not include a power-on 
self test or it may or may not disrupt traffic. 
 describes the types of switch 
resets.
During a hotreset operation, fabric services will be unavailable for a short period 
(30-75 seconds depending on switch model). Verify all administrative changes to 
the fabric (if any) are complete before performing an Nondisruptive Code Load 
and Activation (NDCLA). When upgrading firmware across a fabric using 
non-disruptive activation, upgrade one switch at a time and allow 75 seconds 
between switches.
Common administrative operations that change the fabric include:
„
Zoning modifications
„
Adding, moving or removing devices attached to the switch fabric. This 
includes powering up or powering down attached devices.
CAUTION!
Changes to the fabric may disrupt the NDCLA process.