Kobe Range Hoods CH0036SQB (36") Manuel D’Utilisation

Page de 36
 
 
Ductwork Installation 
8.  Use  8”  round  steel  pipe  (follow  building  codes  in  your 
area)  to  connect  the  ducting  transition  on  the  hood  to 
the ductwork  above.    Use  duct tape  to  make  all joints 
secure and air tight. Refer to Figure 5. 
 
Wiring to Power Supply 
S A F E T Y   W A R N I N G  
RISK  OF  ELECTRICAL  SHOCK.    THIS  RANGE  HOOD 
MUST  BE  PROPERLY  GROUNDED.    MAKE  SURE  THIS 
IS 
DONE 
BY 
QUALIFIED 
ELECTRICIAN 
IN 
ACCORDANCE  WITH  ALL  APPLICABLE  NATIONAL 
AND LOCAL ELECTRICAL CODES.  
 
BEFORE  CONNECTING  WIRES,  SWITCH  POWER  OFF 
AT  SERVICE  PANEL  TO  PREVENT  POWER  FROM 
BEING SWITCHED ON ACCIDENTALLY. 
 
9.  Connect electrical wires. 
 
Connect  three  wires  (black,  white  and  green)  to 
house  wires  and  cap  with  wire  connectors.  
Connect wires according to their colors (i.e. black to 
black,  white  to  white,  and  green  to  green).    See 
Figure 6. 
 
Store wires in the wiring box. 
 
Final Assembly 
CAUTION
:  Install heating lamps last. 
 
10.  Drop oil tunnel into recess support near rear of hood.  
Refer to Figure 7. 
11.  Install  baffle  filters  and  stainless  spacer(s).    Refer  to 
Measurements  and  Diagrams  on  page  21  for  baffle 
filter and stainless spacer placement.  Angle baffle filter 
toward  back  of  hood 
.    Push  baffle  filter  up  until 
almost level 
.  Slide forward into recess behind the 
front of hood 
.  Lower baffle filter 
.  Slide back until 
it fits into resting position 
.  Refer to Figure 8. 
12.  Repeat for all baffle filters and spacers. 
13.  Install  heating  lamps  (not  included),  120  Volts  175 
Watts max. each. 
 
 
 
 
 
 
 
 
 
 
 
 
 
                        Figure 5 
 
 
 
 
 
                    Figure 6 
 
 
 
 
 
                     Figure 7