Dansons Group IPP Manuel D’Utilisation

Page de 40
 
Can
adian Comfort Industries      V04                                            
20                                                        
 PELPRO OWNERS MANUAL 
Copyright 2004                                                                     
www.pelprostoves.com
                                                        
Dansons Group Inc.
 
4
18”
8”
6”
Wood Frame
Construction
Stand Offs 
Part ACI-3HZ
6”
2” Min.
Air gap
Horizontal Vent Installation
Exterior Wall
Wood Surround
Shroud
3” minimum
    air gap
Wall Band / 
Support Brkt
every 5’
Clean Out Tee
10’
2’
B
UILT
-I
I
NSERT 
I
NSTALLATION
 
 
CAUTION: DO NOT BLOCK VENT OPENING
 
The PELPRO Insert may be framed directly into a wall as either a horizontal or vertical vent installation see (figure 
27, 28). The exhaust installation requirements are the same as for a freestanding stove. Refer to “Installing your 
Freestanding Stove” for information concerning installation and proper hook-up of the exhaust. 
 
NOTE: Built-In Installations require Enclosure
 Kit #ACI-3HZ Horizontal Vent or  #ACI-3VL Vertical Vent.
 
 
Dimensions that will be enclosed within the frame work are: 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
This example shows the  
exhaust venting out and  
up vertically 
 
Requires Spacer Kit 
#ACI-3HZ 
 
The framed opening for this 
Installation needs to be: 
 
                Tradition         Bay View 
Height       21” 
 
21 - 25” 
Width        30” 
 
30” 
Depth        17” 
 
17” 
 
 
If constructing a chase, adequate 
Insulation, vapor barrier, drywall,   
And caulking  must be used. 
 
 
 
                                              FIGURE 27  
    
 
24”
18 3/4”
Shroud 1”
+
+
6 1/2”
7 3/4”
8 1/4”
3 ½”
Exh au st
Air Inlet
24”
24 3/4”
12 1/4”
10 3/4”
Traditional Insert / Built-In
24”
19”
  -
23”
Shroud 1”
12 1/4”
10 3/4”
+
Exhaust
26”
+
24”
6 ½”
Exhaust
+
Air Inlet
8 1/4”
7 3/4”
3 ½”
Bay View Insert / Built-In
Adjustable
Hopper