Cleveland ogb-10.10 Manuel Complémentaire

Page de 101
  A signal is sent from terminal 2 of connector X24 on the Gas Board (A20) to
terminal 4 of connector X2 on the Hot Air Power Burner and Fan Control
(U20) selecting the set speed of the combustion blower.
  When this speed is attained the signal is sent from terminal 2 of connector
X2 on the Hot Air Power Burner and Fan Control (U20) to terminal 3 of
connector X24 on the Gas Board (A20)
  A request for heat is sent from terminal 3 of connector X20 on the Gas Board
(A20) to terminal 10 on connector X1 on the Hot Air Control Module (N20)
  24 VAC is sent from terminal 2 of connector X2 on the Hot Air Control
Module (N20) to the hot surface igniter (R20).
  The gas valve is energized allowing gas and air into the burner chamber to
be ignited by the hot surface igniter.
  The Hot Air Burner Control Module (N20) senses at least 1.5 micro amps
DC from the flame sensor (P1) at terminal 3 of connector X2 and sends a
signal from terminal 2 of connector X1 to terminal 10 of connector X25
on the Gas Board (A20
  The heat circuit will remain energized until the cabinet set temperature is
reached
  If the bypass probe (B5) drops below the set level the steam heat circuit will
start again.
f
  When the condensate box is heated to 140 degrees F at the B3probe, 120 VAC is
sent from terminal 5 of connector X12 to the condenser valve (Y1) until the
temperature drops.
g
  When the timer counts to 0 or the core temp probe (B10) reaches the set amount
the cycle ends and the steam generator reverts to the standby temperature of 190-
degree F.
73