Hussmann proto-aire Manuel De Montage

Page de 124
Protocol™ Installation and 
Service Manual 
Installation
 
 
Overview 
 
This section is limited to the information needed to set the Protocol
™ Unit.  Auxiliary 
equipment information is found in the sections devoted to them or in the manuals 
accompanying them. 
 
Related information is contained in Protocol™ Planning Data and the Pumping Station 
Planning Data. 
 
Shipping Damage 
 
All equipment should be thoroughly examined for shipping damage before and while 
unloading. 
 
This equipment has been carefully inspected at our factory, and the carrier has assumed 
responsibility for safe arrival.   If damaged, either apparent or concealed, the claim must be 
made to the carrier. 
 
Apparent Loss or Damage 
 
If there is an obvious loss or damage, it must be noted on the freight bill or express receipt 
and signed by the carrier’s agent; otherwise, carrier may refuse claim.  The carrier will 
supply the necessary claim forms. 
 
Concealed Loss or Damage 
 
When loss or damage is not apparent until after equipment is uncrated, a claim for 
concealed damage is made.  Upon discovering damage, make request in writing to carrier 
for inspection within 15 days and retain all packing.  The carrier will supply inspection 
report and required claim forms. 
 
On Site Damage Control 
 
The Protocol™ is shipped on skids with panels installed.  Remove panels to access lifting 
points on frame.  Do not attempt to move the unit from the skids without first removing the 
panels. 
 