LEAK TESTING
11
IMPORTANT:
VENTILATION
A minimum building ventilation rate of 4 CFM per 1,000 BTU’s of installed heater input must be
provided. This rate of ventilation may be obtained through either gravity or mechanical ventilation of
the building. In conjunction with building ventilation system, adequate fresh air into the building must
be provided through fresh air inlets and/or building inlets. It is recommended local code be checked
to assure the ventilation system and heat installation are in compliance with local and/or state codes.
When checking for gas leaks, do not use an open flame. Use a soap and water solution. Installation of
1/8” NPT plugged tapping, accessible for test gage connections, is required upstream of the gas supply
connection to the heater.
NOTE: Gas connections on the heater are leak tested at the factory prior to shipment.
PRECAUTIONS:
Periodically check the whole gas system for leaks or immediately check if the smell of gas is
detected. Extinguish all open flames.
Never leak test while smoking.
Do not use heater until all connections have been leak tested and do not leak.
When leak testing, refer to the connections diagrams.
Only those parts recommended by the manufacturer should be used.
Substitution can void warranty.
LEAK TEST:
Make  a soap solution of one part liquid
detergent, and one part water.
The soap
solution can be applied with a spray bottle,
brush or rag, soap bubbles will appear where a
leak is present.
Turn the gas supply “ON” check for leaks at leak
points. If a leak is present, turn off supply,
tighten any leaking fittings, turn gas on and
recheck.
Note: There is a manual shut-off lever on
the internal heater control valve/reg-
ulator. This lever is shipped in the
“ON” position (Default position).
"ON" POSITION
FACTORY DEFAULT
"OFF"