Cisco Cisco Content Security Management Appliance M1070 Guide De Montage

Page de 14
7
8  
Plug In and Power Up the 
Appliance
Plug in the appliance, then power up the appliance by pressing 
the On/Off switch on the front panel of the Cisco M190. You 
must wait 10 minutes for the system to initialize each time you 
power up the system. 
After the machine powers up, solid green lights on the front of 
the appliance indicate that the appliance is operational. The 
network activity light will be green but may not be solid. 
Caution
If turned on quickly after connecting power to the 
appliance, the appliance powers up, the fans spin 
and the LEDs turn on. Within 30-60 seconds, the 
fans stop and all LEDs turn off. The appliance 
powers on 31 seconds later. This behavior is by 
design to allow the system firmware and controller 
to synchronize. 
 
 
Wait at least 10 minutes for the system to complete 
the power up sequence and the LEDs to turn green. 
If you turn the power off before the initialization is 
complete, the appliance will NOT reach an 
operational state and must be returned to Cisco.
Item
Port
Description
1
Remote 
Power Cycle
The port that is used for Remote 
Power Cycle (RPC).
2
Console
The console port that directly 
connects a computer to the 
appliance. 
3
Data 1
A Gigabit Ethernet customer data 
interface. This port is used as a 
management interface. 
4
Data 2
A Gigabit Ethernet customer data 
interface.
M190_QSG.fm  Page 7  Thursday, March 31, 2016  4:32 PM