Installation Procedure 
Based on requirements, choose one out of the following two installation procedures:  
 
 : This installation assures effective usage of the available resources. In this installation, VM1 
and VM2 are created with 16 CPUs, while VM3 and VM4 are created with 20 CPUs, each. 
 
 : This installation assures the resources are distributed evenly in all the VMs. In this installation, 
all the 4 VMs are created with 16 CPUs each. 
Important:
  All ASR 9000 TenG interfaces (0 to 11) will be distributed among four StarOS VMs. 0 to 2 for the 
first VM, 3 to 5 for the second VM, 6 to 8 for the third VM, and 9 to 11 for fourth VM. 
How to Install StarOS VMs — Asynchronous distribution 
Step 1 
Untar the qvpc-si-asr9k.ova.tar file (tar -xf qvpc-si-asr9k.ova.tar) to extract the two OVA packages: qvpc-si-asr9k-
16cpu.ova
 and qvpc-si-asr9k-20cpu.ova
Step 2 
Copy both OVA packages to the ASR 9000 RSP. 
Step 3 
Create the first StarOS VM by installing a virtual service using qvpc-si-asr9k-16cpu.ova on the VSM node. 
Use the virtual-service install name SecGW1 package /disk0:/qvpc-si-asr9k-16cpu.ova node 0/1/CPU0. 
Step 4 
After the service is installed, activate the SecGW1 service by configuring three interfaces. See the port mapping table 
below and 
  
Start installation of the second VM only after the SecGW1 is activated. This assures proper resource allocation for the 
second VM. 
Step 5 
Create the second VM by using qvpc-si-asr9k-16cpu.ova on the VSM node. 
Use virtual-service install name SecGW2 package /disk0:/qvpc-si-asr9k-16cpu.ova node 0/1/CPU0. 
Step 6 
Activate SecGW2 by configuring three of the remaining interfaces. See the port mapping table below and 
  
Step 7 
After SecGW2 is active, create the third StarOS VM using qvpc-si-asr9k-20cpu.ova on the VSM node. 
Use virtual-service install name SecGW3 package /disk0:/qvpc-si-asr9k-20cpu.ova node 0/1/CPU0. 
Step 8 
Activate SecGW3 by configuring three of the remaining interfaces. See the port mapping table below and 
  
Step 9 
After SecGW3 is activated, create the fourth VM using qvpc-si-asr9k-20cpu.ova on the VSM node.  
Use virtual-service install name SecGW4 package /disk0:/qvpc-si-asr9k-20cpu.ova node 0/1/CPU0. 
Step 10  Activate SecGW4 by configuring three of the remaining interfaces. See the port mapping table below and