kymco mo x500 Instruction De Maintenance

Page de 19
20
. LIGHTS/METERS/SWITCHES
 
20-18
   XCITING 500
Installation is in the reverse order of removal.
Tighten the mounting screws securely.
HEATER CONTROL UNIT
INSPECTION
Heater control unit inspection
1.Open ignition switch to check if the brown
/blue wire of it is enough voltage.
2.Put the heater controller unit in refrigerator. Start
engine after keeping    the temperature under 10 ±
4℃.
3.Check if the yellow wire of heater controller
unit has output voltage.
Start engine and if the temperature of heater
controller unit is under 10 ± 4℃. Check if the
white/yellow wire of heater controller unit has
output voltage. If it has not any voltage. It is
damaged.
REMOVAL/INSTALLATION
Remove the side body cover (page 2-8).
Remove the nut and heater control unit.
Installation is in the reverse order of removal.
Install the bank angle sensor with its
“UP” mark facing up.
Heater Control Unit
                                          Nut