Emerson 4000 Manuel D’Utilisation

Page de 32
INDEX
Printed in U.S.A.
ASCO Power Technologies, L.P. 2007
In the United States, for service call ASI at 1–800–800–2726 (ASCO).
In Canada, for service call at 1–888–234–2726 (ASCO).
Copyright
A
address, 2–8, 2–9
arrow push–buttons, 1–1
B
baud rate, 2–8, 2–9
C
change password, 2–8, 2–9
clear log, 2–8, 2–9
closed–transition transfer, 4–3
commit to transfer, 2–6, 2–7
communication, 2–8, 2–9
control overview, 1–1
cover removal, A–1
CP settings, see settings
D
date setting, 2–10, 2–11
daylight saving time, 2–11
Decrease Value push–button, 1–1
default settings, 2–2, 2–4, 2–6, 2–8,
2–10
reset, 2–9
delayed–transition transfer, 4–6
description of operation
closed–transition, 4–3
delayed–transition, 4–6
open–transition, 4–1
DIP switch actuators
data input/password lock, A–3
frequency of sources, A–3
nominal input voltage, A–2
phases of sources, A–3
transfer switch type, A–2
E
engine exerciser, 1–2, 2–10, 2–11
engine cooldown, 2–10, 2–11, 4–2
Enter/Save Settings push–button, 1–1
Esc (escape) push–button, 1–1
event logging, 2–8, 2–9, 2–12
F
failuretosynchronize
auto bypass, 2–6
time delay, 2–4, 2–5, 4–4
Features
1C, 2–4, 2–5, 4–1
1F, 2–4, 2–5
2B, 2–4, 2–5, 4–1
2E, 2–4, 2–5, 4–2
3A, 2–4, 2–5, 4–2
5, 2–7, 2–14, 4–1
6B, 2–14
6C, 2–14
6Z, 2–14
11C, 2–10, 2–11, 4–1
27, 2–6, 2–7, 4–1, 4–2
31F, 2–4, 2–5, 4–1
31M, 2–4, 2–5, 4–1
31G, 2–4, 2–5
31N, 2–4, 2–5
34A, 2–14
34B, 2–14
72A, 2–9, 2–13, 4–1
frequency settings, 2–2, 2–3, A–3
G
general settings, 1–2, 2–8, 2–9
H
HELP, for service, call
1–800–800–2726 in the US
1–888–234–2726 in Canada
customercare@asco.com
I
Increase Value push–button, 1–1
inphase monitor, 2–6, 2–7
K
Keypad Locked setting, 2–8, 2–9
L
language, 2–8, 2–9
load shed, 2–6, 2–7
logging, event, 2–8, 2–9
M
Menu Scroll push–buttons, 1–1
O
open–transition transfer, 4–1
P
password, enter, wrong, 2–1
change, 2–8, 2–9
forgotten, A–3
lock, A–3
phase rotation monitor, 2–6, 2–7
phases, A–3
print enable, 2–8, 2–9
S
serial communication, 2–8, 2–9
service, 2–13, 2–14
settings
CP, 2–3
engine exerciser, 1–2, 2–10, 2–11
features, 1–2, 2–6, 2–7
general, 1–2, 2–8, 2–9
overview, 1–2
time & date, 2–10, 2–11
time delay, 1–2, 2–4, 2–5
shed load, 2–6, 2–7
T
test mode, 4–1
time delays
1C, 2–4, 2–5, 4–1
1F, 2–4, 2–5
2B, 2–4, 2–5, 4–1
2E, 2–4, 2–5, 4–2
3A, 2–4, 2–5, 4–2
11C, 2–10, 2–11, 4–1
27, 2–6, 2–7, 4–1, 4–2
31F, 2–4, 2–5, 4–1
31M, 2–4, 2–5, 4–1
31G, 2–4, 2–5
31N, 2–4, 2–5
CT delayed transfer, 2–6, 2–7
inphase monitor, 2–6, 2–7
time setting, 2–10, 2–11
tranfer switch type, A–2
U
unbalance, voltage, 2–2, 2–3
V
view event log, 2–12
voltage DIP switch actuators, A–2
voltage jumper blocks, A–4
voltage settings, 2–2, 2–3
Y
Y–Y primary failure detect, 2–6, 2–8