temco-tool 39rdvn Manuel D’Utilisation

Page de 48
10
RDVN Series Direct Vent Gas Fireplace
20007628
Your fireplace is approved to be vented either through 
the side wall, or vertical through the roof.
•  Only CFM Corporation venting components spe-
cifically approved and labelled for this fireplace 
may be used.
•  Venting terminals shall not be recessed into a wall or 
siding.
•  Horizontal venting which incorporates the twist lock 
pipe must be installed on a level plane without an 
inclining or declining slope.
• 
Horizontal venting which incorporates the use of flex 
venting shall have an inclining slope from the unit of 
1” (25 mm) per 24” (610 mm).
General Venting
There must not be any obstruction such as bushes, 
garden sheds, fences, decks or utility buildings within 
24” from the front of the termination hood.
Do not locate termination hood where excessive snow 
or ice build up may occur. Be sure to check vent termi-
nation area after snow falls, and clear to prevent ac-
cidental blockage of venting system. When using snow 
blowers, make sure snow is not directed towards vent 
termination area.
Location of Vent Termination 
It is imperative the vent termination be located observ-
ing the minimum clearances as shown on the following 
page.