MTI Co. Ltd. RF25-MWM101 Manuel D’Utilisation

Page de 36
 
 
 
 
 
 
 
 
BDA Installation and Operating Guide 
Version 1.0                                                                          9 
1.4 Electrical 
Power 
 
z
  Power source must be stable and maintain enough capacity. It must also be 
protected against surge and lightning. 
„
 100Vac 
z
  A AWG 6 or AWG 8 multi-wired cord must be used for grounding. The cable for 
grounding must not be placed paralleled to other cables. 
 
1.5 Initial 
Check 
 
z
 Unpacking 
Prior to unpacking, check the containers for damage. If any damage or 
mis-handling is evident, request that the carriers be present to witness the 
unpacking and further inspection. 
Carefully open the containers, remove the top layer of shock absorbing 
material, and lift the equipment out of its container. 
 
z
 Mechanical 
Inspection 
Check the equipment for damage. Inspect the housing and panel surfaces 
for scratches and dents. Check that all external fasteners are securely in place 
and that no obvious attempt has been made to remove any of these. 
 
z
 Damage 
If the equipment is damaged or fails to meet specifications upon receipt, 
notify MTI Co., Ltd. immediately. 
 
z
 Storage 
The equipment should be placed in its original container for storage, and 
should be stored in a cool, clean and dry environment. 
 
1.6  Check list of Supplied Items 
 
 
„
  BDA : 1unit 
„
  AC power cord: 1 set 
 
 
 
Figure 6 BDA with AC power cord