3.2 Installation Procedure for network 
 
3.2.1  Total network configuration   
 
3.2.1.1 
Network configuration   
 
 
 
Figure 19 Total network configuration for indoor 
 
z
 
Ensure that modules, cables and connectors inside the unit are properly equipped 
before starting installation. 
z
 
Unscrew the ground lug from the “CHASSIS” port of BDA, and insert ground wire 
into the lug. Screw up the ground lug to the place as it was and connect the other 
end of the ground wire to a ground bar prepared in the site. 
z
 
Ensure that AC input power is in the range of the specification (typical AC 110V: 
range AC 90V ~ AC120V). 
z
 
Connect the power plug of the power cable to the power input port on the bottom 
of the BDA, and check if ‘POWER’ LED on the front of the BDA is green and ‘RUN’ 
LED is blinking.   
z
 
Connect coaxial cable to 50
Ω antenna or attenuator for testing. 
z
 
Connect Laptop PC to BDA controller as figure 13. connection of Laptop PC in 
BDA. 
z
 
Connect the AC power cord of the power cable to the input port on the bottom of 
the BDA. 
 
3.2.2  Network adjustment procedure 
 
The BDA should be connected to a laptop PC with the USB cable to control BDA locally. 
Plug the USB cable from the laptop PC into theUSB port of the BDA controller. Execute 
GUI program at laptop PC. Refer to operating software guide for monitoring and controlling 