MTI Co. Ltd. RF25-MWM101 Manuel D’Utilisation
BDA Installation and Operating Guide
Version 1.0 9
1.4 Electrical
Power
z
Power source must be stable and maintain enough capacity. It must also be
protected against surge and lightning.
100Vac
z
A AWG 6 or AWG 8 multi-wired cord must be used for grounding. The cable for
grounding must not be placed paralleled to other cables.
1.5 Initial
Check
z
Unpacking
Prior to unpacking, check the containers for damage. If any damage or
mis-handling is evident, request that the carriers be present to witness the
unpacking and further inspection.
Carefully open the containers, remove the top layer of shock absorbing
material, and lift the equipment out of its container.
mis-handling is evident, request that the carriers be present to witness the
unpacking and further inspection.
Carefully open the containers, remove the top layer of shock absorbing
material, and lift the equipment out of its container.
z
Mechanical
Inspection
Check the equipment for damage. Inspect the housing and panel surfaces
for scratches and dents. Check that all external fasteners are securely in place
and that no obvious attempt has been made to remove any of these.
for scratches and dents. Check that all external fasteners are securely in place
and that no obvious attempt has been made to remove any of these.
z
Damage
If the equipment is damaged or fails to meet specifications upon receipt,
notify MTI Co., Ltd. immediately.
notify MTI Co., Ltd. immediately.
z
Storage
The equipment should be placed in its original container for storage, and
should be stored in a cool, clean and dry environment.
should be stored in a cool, clean and dry environment.
1.6 Check list of Supplied Items
BDA : 1unit
AC power cord: 1 set
Figure 6 BDA with AC power cord