ZTE Corporation R8978S2600L Manuel D’Utilisation

Page de 66
ZXSDR R8978 User Manual
4.4 Power On
Caution!
Before power on, you need to check the equipment and cable installation in detail,
to ensure that all the installation results comply with the engineering installation
specifications.
shows the power-on flow.
Figure 4-2 Power-on Flow
For a description of the ZXSDR R8978 power-on flow, refer to
.
4-4
SJ-20141113151137-001|2016-08-17 (R1.2)
ZTE Proprietary and Confidential