Z Com Inc ZC3625-55V04 Manuel D’Utilisation

Page de 33
 
Chapter 3 Hardware Installation 
Page 20
injector RJ-45 jack (
P+DATA OUT
); 
3. 
Connect the power module to the power injector and plug the AC cord into an AC power 
receptacle; 
4. 
After being powered on, the device will send out the beep sound lasting about 1.5 
seconds, informing you that the ZC-3625-55-23 is powered up!  Wait for about 60 
seconds the system will be initialized and start working. 
 
1.  
 
  Make sure PoE is correctly connected to the RJ-45 port on the ZC-3625-55-23 
labeled PoE+Data, otherwise the extender will be severely damaged! 
 
Warning: