Satel Oy SATEL-TA31 Manuel D’Utilisation

Page de 49
 
 
    SATELLINE-M3-TR8 
 
 
  SATELLINE-M3-TR9 
Integration Guide, Version 1.7 
 
36 
11 APPENDIX A 
11.1 Sub-band Channel Assignment – SATELLINE-M3-TR8 
11.1.1 
Sub-band  
 
Each sub-band is defined by a start and stop frequency. Furthermore the maximum allowed power 
level and maximum duty cycle is defined separately for each sub-band.  
11.1.2 
Duty cycle 
 
The purpose of the duty cycle limit is to ensure that no single application can occupy this license-
free band for more than a certain percentage of time. The term duty cycle defines the percentage 
of a 1-hour period a single modem is allowed to transmit. The modem limits the duty cycle itself.  
11.1.3 
Power level 
 
The power level limit is defined separately for each sub-band. The maximum power limit for each 
sub-band is pre-programmed into the SATELLINE-M3-TR8. The user can choose from 10, 20, 50, 
100, 200 and 500 mW ERP* output power for frequency variant 868…870 MHz and for Indian 
frequency variant 865…867 MHz following power levels: 10, 20, 50, 100, 200, 500 and 1000 
mW ERP*. No matter what power level the user has chosen the maximum allowed power level of 
the chosen sub-band cannot be exceeded. 
  
*ERP = The effective radiated power from the antenna relative to a half-wave dipole in a certain 
direction.  
11.1.4 
Channel assignment 
 
Each  sub-band  is  divided  into  25  kHz  channels  according  to  a  channel  assignment  scheme 
defined by the recommendation CEPT/ERC/REC 70-03.