ADC Telecommunications Inc. F0694-011 Manuel D’Utilisation

Page de 234
Preparing for System Installation
7-8
InterReach Fusion Wideband Installation, Operation, and Reference Manual
CONFIDENTIAL
D-620616-0-20 Rev D
7.3.3
Tools and Materials Required
* Refer to Appendix A for CATV cable requirements.
Configuring the System
PC/laptop running 
standard browser software
Refer to the AdminBrowser User Manual (PN D-620607-0-20)
Miscellaneous
Cross-over Ethernet cable
Male connectors; Fusion Wideband Main Hub to a PC/laptop running a standard 
browser to the Fusion Wideband AdminBrowser software; local connection or 
LAN switch connector for remote connections.
Straight-through cable
Female/male connectors; Fusion Wideband Main Hub to a modem for a remote 
connection.
Distances
Fusion Wideband Main Hub is within 3–6m 
(10–20 ft) of connecting repeater/BTS/Flex-
Wave
If longer distance, determine the loss of the cable used for this connection and 
adjust the RF signal for each Band into the Fusion Wideband Main Hub accord-
ingly. This can be done by readjusting the power from the base station, or by 
changing the attenuation value between the base station/repeater and the Hub 
Bands (1 and 2).
Table 7-3
Tools and Materials Required for Component Installation 
3
Description
Cable ties
Screwdriver
Mounting screws and spring nuts
Screws, anchors (for mounting RAUs)
Drill
Fiber connector cleaning kit
Fusion splicer
Splicing tool kit (including snips, cladding strippers, fiber cleaver, isopropyl alcohol, 
lint-free wipes)
Fusion splicing sleeves
Table 7-2
Installation Checklist (continued)
3
Installation Requirement
Consideration