Pit Installation
Through the Lid Installation Kit (SE, ME and CE Endpoints)
The Through the Lid Installation Kit is designed for use with a lid with maximum thickness of one-inch, and a standard 
hole diameter of 1-7/8 inches.
Figure 2:  ORION Pit Endpoint
To install the endpoint through the lid, follow these steps per Figure 2.
1.  Screw the nut onto the tube threads as shown.
2.  Insert the tube through the bottom of the lid.
3.  Screw the top cap onto the tube threads as shown and tighten.
4.  Tighten the nut against the bottom of the lid until secure.
If installing an ORION endpoint through a thick lid, you may use a Pit Tube Extender (67025-001) which requires a  
two-inch diameter hole. With line of sight, RF performance will be reduced when using this extension.
Pit Lid
Top Cap
Nut
Tube
1" Maximum Pit Lid 
Thickness