Kelvin Hughes Limited SXV-A1 Manuel D’Utilisation
SharpEye™ SCV & SxV X-Band Radome Radar
Chapter 7: Termination
KH-1650-CA issue 1
Page 37 of 60
M6 EARTH STUD ASSEMBLY
The strap and washers should be assembled as shown below.
When the earth strap has been secured, the surfaces should be lightly covered in the anti-corrosion
paste supplied as part of the fitting kit. This paste protects the connection against water ingress and
corrosion.
In addition, Denso tape or a suitable self-amalgamating tapes may be used to protect the connection/
joint from corrosion.
CONDUCTIVITY TESTING
Once fitted, the earth bonding should be measured to ensure good conductivity is achieved. See
Section 11: Planned maintenance for the correct test procedure.