HP Performance Optimized Data Center (POD) 20cp Instruction De Maintenance

Page de 81
 
Periodic maintenance  64 
Component to be inspected 
Task 
Frequency 
Capable Party 
Humidifier drains 
Put the humidifier in system flush 
mode and inspect drain flow and 
water supply flow. Inspect, clean, 
and/or replace as necessary. 
Quarterly 
Qualified personnel 
— 
Inspect for any internal or external 
water leaks, repair or replace 
leaking components. 
Quarterly 
Qualified personnel 
— 
Using LLS, verify proper cylinder 
operation. Inspect the cylinder for 
blackened areas and, if present, 
check the condition of the 
electrodes. If necessary, replace 
the cylinder. 
Quarterly 
Qualified personnel 
— 
Replace the cylinder. 
Annually 
Qualified personnel 
 
 
ECS 
 
Component to be inspected 
Task 
Frequency 
Capable Party 
Full system functional check 
Operational check of all system 
components 
Quarterly 
Qualified personnel 
— 
Check and clear alarm log 
Quarterly 
Qualified personnel 
— 
Inspect and test ECS battery 
backup system 
Every 2 years 
Qualified personnel 
 
 
Electrical 
Maintenance of the electrical components might require the following: 
 
Expose personnel to high voltage. 
 
Allow personnel to come into direct contact with high voltage. 
 
Power down the POD during the execution of the maintenance item. 
You must explicitly state and acknowledge if a POD power down will be possible. If a power down is not 
possible, LLS inspections will be conducted and further action will be taken at your discretion. 
 
Component to be inspected 
Task 
Frequency 
Capable Party 
Electrical connections 
Use LLS to check for major 
electrical connections (torque 
marks, sizzle, and acrid odor): 
 
Main/House Power Feeds 
 
Busway End Feeds, Drop 
Boxes (including cables and 
cord caps) 
 
Electrical panels, breakers, 
and disconnects 
 
480/415 VAC transformer 
Quarterly 
Licensed electrician