Site plan requirements and actions  22 
 
Ensure that the site safety and security programs are properly administered. 
 
Interface directly with the HP installation project manager to ensure clear lines of communication during 
the installation and commissioning processes. 
 
Site planning 
A comprehensive site plan assists with the site design (MEP) and ensures the best possible HP POD 20c 
installation process. When creating a site plan, consider the following information: 
 
HP POD 20c site requirements detailed in this document 
 
HP POD 20c site preparation drawing package 
 
HP POD 20c readiness checklist ("
" on page 
) 
 
HP POD 20c installation (on page 
) 
The HP team can assist you by answering questions and help to guiding you throughout the process. 
 
HP POD 20c installation 
HP POD 20c installation includes the following: 
 
Installation equipment staging (on page 
) 
 
HP POD 20c lifting layout (on page 
) 
 
HP POD 20c storage requirements (on page 
) 
 
Additional structures (on page 
) 
 
Installation equipment staging 
Staging for the following items must be identified and considered: 
 
Truck and component staging 
 
Installation equipment staging 
 
Site traffic 
 
Regulatory or local permits 
 
HP POD 20c lifting layout 
When preparing a site plan, identify where to place the HP POD 20c and the equipment that is used for 
assembly. The following figure shows an HP POD 20c assembly site and includes: 
 
HP POD 20c location 
 
Crane location