Euphonix Studio Hub SH612 Manuel D’Utilisation

Page de 44
Euphonix SH612 Studio Hub User Guide
25
Chapter 4: Integration With Jupiter VM3000 
Routers
The SH612 with ES-Control firmware can be controlled by the ES-capable Thomson 
Grass Valley Jupiter. This chapter details integrating the SH612 with the Jupiter. 
Make sure your SH612 has the ES-Control firmware by watching for ES-Control 
Equipped Edition
 and the firmware revision (with ES after the number) on the second 
bootup screen on the LCD display when turning on the SH612.
Your Jupiter system must have the ES Bus Router Control and Third Party Router 
Control Unrestricted
 options enabled. If these are not installed, contact Thomson 
Grass Valley to obtain them. Without these options, the Jupiter does not have the capa-
bility to control the Studio Hub.
NOTE:
This chapter assumes you have an installed Jupiter router system and are trained to 
use it. If you are new to the Jupiter system, consult its documentation and familiarize 
yourself with its operation before proceeding with this section.
4.1
Connections and Basic Setup
We recommend installing the SH612 in the same rack as the Jupiter VM3000 control 
board to minimize cable length and make checking configuration and communication 
between the two devices easier. 
For the SH612 to receive and acknowledge commands from the VM3000, the Control 
Port must be set to RS422 (see page 9 for instructions). Make sure to cycle the SH612’s 
power off/on after resetting the Control Port. 
NOTE:
Make sure no control cables are connected to the SH612 or the following procedure 
will not be possible.